Supply The New Technology Ibs System for Any Construction.
Muaz 3 - Fri 12/Jul/2013 12:56pm
Muaz 3 - Fri 12/Jul/2013 12:56pm
the component is new cast in the site...
-lightweight..
-save cost more than 20% compare with conventional construction
-the load structure can be reduce.
-the component(material) by cast in the site.
interest?
call me: 013-3784328(muaz)-shah alam.
Niche: Kedai Hardware
-lightweight..
-save cost more than 20% compare with conventional construction
-the load structure can be reduce.
-the component(material) by cast in the site.
interest?
call me: 013-3784328(muaz)-shah alam.
Niche: Kedai Hardware
- No comment yet!